South Kansas & Oklahoma Railroad (SKOL) Rehabilitation Project
FY 2021 CRISI GRANT DOCUMENTS
Bidder Qualification
Request For Proposal
Specifications
- Watco CWR Policy 2022
- CWR Specifications
- Road Crossing Specifications
- Detailed Crossing Scope of Work
- SKOL Port Lead Signalized Crossing List
- No. 8910 Turnout Specifications
- No. 10 Turnout Specifications
- Ballast Installation Specifications
- Snyder Ballast Specifications
- Tie Installation Specifications
- Surfacing Specifications
- Track Construction Specifications
Bridges:
- Detailed Bridge Scope of Work
- Scope of Work Cost Sheet
- Engineering Support
- SKOL Concrete Repair Specifications
- SKOL Timber Specification
- Watco Bridge Contractor Requirements
- Bridge Pre Bid Meeting Attendance
Frank Phillips Blvd Design:
Safety Requirements/Specifications
Federal Requirements
- Attachment 1 – Standard Terms and Conditions
- Attachment 1A – CRISI Clauses
- Buy America with Highlights
Track Charts and Timetable
- Tulsa Subdivision Scope of Work
- Moline Subdivision Scope of Work
- Neodesha Subdivision Scope of Work
- Port of Catoosa Scope of Work
Maps
- CRISI Scope (All Maps)
- CRISI Overview Map
- Tulsa Subdivision
- Tulsa Subdivision Map 1
- Tulsa Subdivision Map 2
- Moline Subdivision
- Neodesha Subdivision
- Port of Catoosa
Reporting
Additional Documentation
Post Meeting Information
- CRISI Pre Bid Attendance Sheet
- CRISI Post Meeting Notes – CRISI 001
- CRISI Post Meeting Notes – CRISI 002
- CRISI Post Meeting Notes – CRISI 003
- SKOL CRISI Bridge Scope Addendum 001
- SKOL CRISI Bridge Scope Addendum 002
SKOL CRISI Bid Document